| |
| 38KW TO 120KW Powered by Perkins |
|
Pekins Three-Phase Diesel Generating Set
Starting method:
1) Key start.
2) Automatic starting wholly when electric supply has been stopped. The gensets
can start automatically in 3-28 seconds (time can be adjustable) between
eclectic supply and gensets need 6-8 seconds, it will spend 12 seconds to
accept load when electric supply resumed, genset will maintain 20-230 seconds,
then closes down automatically.
3) Control panel system: voltmeter, hertz meter, amp meter, voltmeter of battery,
gauge of water temp, gauge of oil pressure, control section: start/stop, key type
switch, inductive type self-protection switch.
|
|
|
|
|